we have appointed a manager of the caps program, and of course that is the community action plan for seismic safety. it is a plan we wanted to make sure that was lead by someone who can immediately get on the ground and figure out all of the things that we need to do to make sure the soft story buildings which are the most important focus that we have to have for the next seismic event and starts with that planning with all of us, so i wanted to make sure to introduce and congratulate patrick otiline who has come aboard to take care of this incredible responsibility. patrick, thank you very much for being here today. [applause] i will note that currently the
we have appointed a manager of the caps program, and of course that is the community action plan for seismic safety. it is a plan we wanted to make sure that was lead by someone who can immediately get on the ground and figure out all of the things that we need to do to make sure the soft story buildings which are the most important focus that we have to have for the next seismic event and starts with that planning with all of us, so i wanted to make sure to introduce and congratulate patrick...
SFGTV: San Francisco Government Television
62
62
Nov 25, 2012
11/12
by
SFGTV
tv
eye 62
favorite 0
quote 0
we noticed an -- on the seismic upgrade on the bay division in early september. this is important because this is the last project that was listed in california assembly bill 1823 to go into construction. the over all reliability of our system was also enhanced in mid-august, when we achieved substantial completion on the bay division pipeline three and four cross-over projects. we also accelerated pipeline installation in the san joaquin pipeline and we were able to complete all pipeline work on that project within a very narrow and environmental window that was mandated by resource agencies. and finally, i wanted to highlight the excellent progress being made on the replacement of the crystal springs pipeline number two project we're on target to reach substantial completion by the end of 2012. as you know, we're doing a lot of work to upgrade both of our treatment plants at harry tracy work is progressing very well. we're now 31%. and by the end of the year we're pushing to be at 40%. what you see on the left photo there is construction of the five new filters
we noticed an -- on the seismic upgrade on the bay division in early september. this is important because this is the last project that was listed in california assembly bill 1823 to go into construction. the over all reliability of our system was also enhanced in mid-august, when we achieved substantial completion on the bay division pipeline three and four cross-over projects. we also accelerated pipeline installation in the san joaquin pipeline and we were able to complete all pipeline work...
SFGTV2: San Francisco Government Television
91
91
Nov 16, 2012
11/12
by
SFGTV2
tv
eye 91
favorite 0
quote 0
because otherwise, we can never bring any building up to the current seismic safety code.. >> okay okay the public hearing is done. commissioner more. >> i would like to open up the conversation about the know litigation and compare this without speaking to the project that we had two weeks ago and it was an extensive remodel and where indeed the existing house was wrapped with new construction on the outside and however since we are not recentlied architect to do the calculations, i'm asking the department for first in what way do you take a calculation submitted to you on sheet a 1.2 as a fact or how far do you go back questioning that these calculations are done accurately >>> in a sense the approvalling planner went overt standard approved by the architect and was confident and in fact, this did not qualifify as a demolition. >> and basically this was printed on the -- [inaudible] . >> information and their own review of that information it did not qualify as a demolition, okay i'm going to ask mr. butter who's a registered architect you have reviewed thews plans is this a demolitio
because otherwise, we can never bring any building up to the current seismic safety code.. >> okay okay the public hearing is done. commissioner more. >> i would like to open up the conversation about the know litigation and compare this without speaking to the project that we had two weeks ago and it was an extensive remodel and where indeed the existing house was wrapped with new construction on the outside and however since we are not recentlied architect to do the calculations,...
SFGTV: San Francisco Government Television
115
115
Nov 16, 2012
11/12
by
SFGTV
tv
eye 115
favorite 0
quote 0
sure the soft story buildings which are the most important focus that we have to have for the next seismic event and starts with that planning with all of us, so i wanted to make sure to introduce and congratulate patrick otiline who has come aboard to take care of this incredible responsibility. patrick, thank you very much for being here today. [applause] i will note that currently the caps program is lodged under city mmptdor's office and a conversation i had when i was city administrator and we wanted to put it at a place, but it is there for now, but with patrick's help we will make sure that program flourishes at the right place and with all the different resources that we have to have along with my commitment we will have appropriate legislation in due time when we are ready when placed out before the voters what we require but we will do that in collaboration and not talking out because it is expensive and we know lives are at stake and we have to do it the right way and have a program that will work for everybody. now, i also want to say to you that there has been a person certain
sure the soft story buildings which are the most important focus that we have to have for the next seismic event and starts with that planning with all of us, so i wanted to make sure to introduce and congratulate patrick otiline who has come aboard to take care of this incredible responsibility. patrick, thank you very much for being here today. [applause] i will note that currently the caps program is lodged under city mmptdor's office and a conversation i had when i was city administrator...
SFGTV2: San Francisco Government Television
93
93
Nov 13, 2012
11/12
by
SFGTV2
tv
eye 93
favorite 0
quote 0
we noticed an -- on the seismic upgrade on the bay division in early september. this is important because this is the last project that was listed in california assembly bill 1823 to go into construction. the over all reliability of our system was also enhanced in mid-august, when we achieved substantial completion on the bay division pipeline three and four cross-over projects. we also accelerated pipeline installation in the san joaquin pipeline and we were able to complete all pipeline work on
we noticed an -- on the seismic upgrade on the bay division in early september. this is important because this is the last project that was listed in california assembly bill 1823 to go into construction. the over all reliability of our system was also enhanced in mid-august, when we achieved substantial completion on the bay division pipeline three and four cross-over projects. we also accelerated pipeline installation in the san joaquin pipeline and we were able to complete all pipeline work...
SFGTV2: San Francisco Government Television
114
114
Nov 19, 2012
11/12
by
SFGTV2
tv
eye 114
favorite 0
quote 0
wind, appropriately you have designed to seismic. that is the key to the very robust central core that has a concrete box surrounding it. you see the three exit stairs and you see the great number of elevator and this happens to be one of the lowest floors and that is the low, rise, elevator core that is colored in. this is the mid point of the tower and this is about a 20,000 foot square plate and then the top plate of the tower, 18,500 square feet. at the middle part of the tower's exterior, there is also still the middle, shading that is surrounds the entire building access of sun shade and access of architectural defining advice giving the building a great deal of texture. it is anticipated to be painted in a very beautiful, white, metal metallic color that has a resonance and glow in the sunlight and also even in doctored conditions will feel rather light and inviting. you see, that from inside we have been careful to keep the large columns away from the corners, so that the curved corner creates this beautiful panaramic view fr
wind, appropriately you have designed to seismic. that is the key to the very robust central core that has a concrete box surrounding it. you see the three exit stairs and you see the great number of elevator and this happens to be one of the lowest floors and that is the low, rise, elevator core that is colored in. this is the mid point of the tower and this is about a 20,000 foot square plate and then the top plate of the tower, 18,500 square feet. at the middle part of the tower's exterior,...
SFGTV: San Francisco Government Television
66
66
Nov 27, 2012
11/12
by
SFGTV
tv
eye 66
favorite 0
quote 0
wind, appropriately you have designed to seismic. that is the key to the very robust central core that has a concrete box surrounding it. you see the three exit stairs and you see the great number of elevator and this happens to be one of the lowest floors and that is the low, rise, elevator core that is colored in. this is the mid point of the tower and this is about a 20,000 foot square plate and then the top plate of the tower, 18,500 square feet. at the middle part of the tower's exterior, there is also still the
wind, appropriately you have designed to seismic. that is the key to the very robust central core that has a concrete box surrounding it. you see the three exit stairs and you see the great number of elevator and this happens to be one of the lowest floors and that is the low, rise, elevator core that is colored in. this is the mid point of the tower and this is about a 20,000 foot square plate and then the top plate of the tower, 18,500 square feet. at the middle part of the tower's exterior,...
SFGTV2: San Francisco Government Television
123
123
Nov 19, 2012
11/12
by
SFGTV2
tv
eye 123
favorite 0
quote 1
done and make it even a better libraries, because libraries are centers for our communities. they are seismically safe. they are going to have the most modern equipment for our kids to grow up and promise all of the things that we promised for them to do to become even better residents. the things that keeps me going and everybody else goes in collaboration, we're doing it for you. it's not about us. it's not about announcements, about things that are politically smart for us to do. it's about the future of this city. and with these 24 branches, and now the smart thing to do, connect up with great parks. yes. [ applause ] because the vision, julie didn't have a vision of just having a great center library; right? our neighborhoods aren't just going to accept that to be the end. it's to connect it up with world-class parks. that is what prop b is about and why we work together and mohammed comes in and smooths out columbus avenue. because i just road that street and it feels like a construction road [ laughter ] we have got to get all of these roads built and this is what scott wiener and others w
done and make it even a better libraries, because libraries are centers for our communities. they are seismically safe. they are going to have the most modern equipment for our kids to grow up and promise all of the things that we promised for them to do to become even better residents. the things that keeps me going and everybody else goes in collaboration, we're doing it for you. it's not about us. it's not about announcements, about things that are politically smart for us to do. it's about...
158
158
Nov 29, 2012
11/12
by
LINKTV
tv
eye 158
favorite 0
quote 0
to gather more clues of an impending disaster, mo a her team bury sensitive seismic monitors the signals are radioed toecback to the institute, where each new installation tests the equipment and the scientists' nerves. ( equipment whirring ) mothes: whee! good work. narrator: mothes and geologist peter hal, hopinghat they won't someday have to make the tough call. eruptions can kill and destroy. but evacuations cause greapersa. what if they sound the alarm antu not ally owp? wi peobelieve em what ifthe next time,e alarm before it really does? suddenly, after monitoring the mountain for five years, their theoretical problem has become alarmingly real. ( rumbling explosions echoing ) mothes: in september 1998, our existing seismic network on the volcano began to register a greater numb of fracture-type earthquakes beneath the volcano. narrator: the next august, tungurahua releases a column of steam thousands of feet in the air. the deadly vapor accompanies more earthquakes and sulfur emissions. it's time for the scientists to go public. on the tenth of september, we decided we had better
to gather more clues of an impending disaster, mo a her team bury sensitive seismic monitors the signals are radioed toecback to the institute, where each new installation tests the equipment and the scientists' nerves. ( equipment whirring ) mothes: whee! good work. narrator: mothes and geologist peter hal, hopinghat they won't someday have to make the tough call. eruptions can kill and destroy. but evacuations cause greapersa. what if they sound the alarm antu not ally owp? wi peobelieve em...
15
15
tv
eye 15
favorite 0
quote 0
shift a seismic home watching all. so they're talking about a seismic shift in people that are actually foregoing their cable boxes and for going to be and they're going online to get their streaming so as a result time warner cable for example is driving attention to their high speed data and online streaming where more people are watching shows the company just reported and so that's where they saw some of this shifting but dimitri what's really interesting about this is used to work at cablevision where you never thought people were going to give up their t.v.'s right yeah that was actually interesting because i was part of a part of that over group brings you teach a product to the world support and trying to show it was well it was small but we were focused on cable were looking towards the future and i went in there thinking ok cables will be dead in a few you know five ten years whatever but i was surprised to see how resilient wasn't people really were fixated on their cable box when we do focus groups people a
shift a seismic home watching all. so they're talking about a seismic shift in people that are actually foregoing their cable boxes and for going to be and they're going online to get their streaming so as a result time warner cable for example is driving attention to their high speed data and online streaming where more people are watching shows the company just reported and so that's where they saw some of this shifting but dimitri what's really interesting about this is used to work at...
SFGTV2: San Francisco Government Television
91
91
Nov 14, 2012
11/12
by
SFGTV2
tv
eye 91
favorite 0
quote 0
because seismic upgrades, it is all about beating the event. it is all about building this hospital before the events come, and there will be some forced effort to... that might cause us even more damage and more threat to our own health. now i want to thank brenda and her leadership at the hospital because she has been steadfast in making sure that she has got a team that delivers on both the economics of it and working with james and the board of trustees to make sure that they have experts on the design and the engineering of this, to make sure that the footprint can accommodate the build-out. and we have had to have very good conversations with the planning department to get this to as well. so the whole team effort, in putting this forth, and making sure that once they got the planning approval, that the board acted responsibly and they have. and so i want to thank everybody for all of their roles from the community, doctors, to our seniors, and their help to the advocates, and to the chinese chamber and the board of trustee and their advo
because seismic upgrades, it is all about beating the event. it is all about building this hospital before the events come, and there will be some forced effort to... that might cause us even more damage and more threat to our own health. now i want to thank brenda and her leadership at the hospital because she has been steadfast in making sure that she has got a team that delivers on both the economics of it and working with james and the board of trustees to make sure that they have experts...
SFGTV: San Francisco Government Television
88
88
Nov 19, 2012
11/12
by
SFGTV
tv
eye 88
favorite 0
quote 0
when you have a building that is the aim of this one you are not going to be able to meet the current seismic code with those foundations because you cannot put anchor bolts into the foundation that wand the bolt that we are retired to have now and i would like to persistent out the drawings that mr. williams was showing included interior partition and is that is clearly not part of the san francisco planning department criteria for demolition it has do with interior walls and the vertical surfaces. so ... the other thing that were the to point out is that there is also not really a way to meet both the energy code, the lateral code and the fire code for walls without removing the at least the interior claddings and sometimes the ex-tierior cladding. so i hope that helps a bid. >> air force couple of questions and first the stated date of this home being built was 1879 and now admittedly looking at the outside somebody did some things because everything was wood frame and mow it looks stucco and so would i would assume there were alterations over the years first of all, i'm mr. washington. >>
when you have a building that is the aim of this one you are not going to be able to meet the current seismic code with those foundations because you cannot put anchor bolts into the foundation that wand the bolt that we are retired to have now and i would like to persistent out the drawings that mr. williams was showing included interior partition and is that is clearly not part of the san francisco planning department criteria for demolition it has do with interior walls and the vertical...